The electics will be buried under the insulation. I've dug it out and, for the time being, will surface mount it. Later this floor will be re-wired.
Only need to reveal enough cable to be able to bring the box out onto the new 'wall'.
Bubble wrap arrived. Oops, sorry, expensive, breathable, hi tech membrane. The 100 hammer fixings arrived too, all 10 of them. Feeling tired now. Can I stop please?
Went and cut up the studding wood. Used most of it already. It was free, scavenged. Probably have to buy the rest as I feel a need for it. Ouch.
Now this floor and the middle one has no lighting circuit. We'd better get on and rewire, because we're relying, here on in, on bedside lights; one in the bathroom and the two in the bedroom. Anyone coming to stay will have to make do and mend!
Return to Muddy Boots homepage http://bloginell.blogspot.com